Get free quotes

Free calculator

Racking inspection checklist

Walk each run of racking and mark every item green, amber or red. The summary tells you what to offload now, what to repair soon and what to watch, and prints as a record.

Racking inspection checklistTL-08
  • UprightsDents, bends, twists or splits, most often in the bottom metre where forklifts hit
    Uprights
  • BracingDiagonal and horizontal braces bent, loose or missing
    Bracing
  • BeamsBent, dented, twisted or sagging more than usual under load
    Beams
  • Beam connectorsCracked welds, opened or distorted hooks, connectors lifting out of the upright
    Beam connectors
  • Beam locksA safety lock or pin in every beam connector
    Beam locks
  • Baseplates and anchorsEvery baseplate present and undamaged, anchors in and tight
    Baseplates and anchors
  • PlumbFrames standing straight, no run leaning or out of line
    Plumb
  • Load noticesA load notice on each run and the loads within it
    Load notices
  • Pallets and loadsSound pallets, sitting square on the beams, nothing hanging over the aisle or resting on bracing
    Pallets and loads
  • Decks and supportsMesh decks, pallet supports and shelf panels in place and undamaged
    Decks and supports
  • ProtectionUpright guards and end of run barriers in place and still doing their job
    Protection
  • FloorNo cracks, sinking or broken concrete around the baseplates
    Floor
  • Spacers and tiesRun spacers between back to back runs and wall or top ties where fitted
    Spacers and ties
  • Aisles and fluesAisles clear, the gap between back to back loads kept open
    Aisles and flues

The summary

Checked
0 of 14
Red: offload now
0
Amber: repair soon
0
Green: record and watch
0

Racking that is knocked or overloaded can fail without much warning. Regular walk-round checks by your own staff, with an expert inspection at least once a year, catch damage early. This checklist follows the widely used traffic light approach: green, amber and red.

What the colours mean

  • Green: damage within the maker's limits. Record it and check it again at the next inspection. It still reduces the safety margin, so it is not "no damage".
  • Amber: damage that needs repair, but not at once. Once the positions are emptied, don't reload them until the repair is done. If it isn't repaired within four weeks, treat it as red.
  • Red: serious damage. Unload the bays at once, keep them out of use and repair them with the maker's parts before reloading.

Damaged parts are replaced, not straightened. Bent uprights and beams lose strength even when bent back.

How often to check

The Occupational Health and Safety Act makes the employer responsible for safe equipment. Widely used practice is a quick visual check by trained staff every week or so, a recorded check every month, and an inspection by a competent expert at least once a year, more often on busy sites. Report damage straight away, and keep the checklists as a record.

Frequently asked questions

Who can inspect racking?
Your own trained staff can do the routine checks with this list. The yearly expert inspection should be done by someone competent in racking, usually an independent inspector or the maker, who measures damage against the maker's limits and gives a written report.
What should I do after a forklift knock?
Report it at once, look at the upright and beams, and if there is visible damage, unload the bays and keep people away until it has been assessed. Don't straighten bent steel.
Does the checklist replace a professional inspection?
No. It helps you walk the racking regularly and keep a record. The expert inspection measures damage against the maker's limits, which needs training and tools.

More calculators and tools

Free quote request, no obligation

Request quotes: a racking inspection

Fill it in the way a storeman books stock in: how many pallets and how heavy, how high the building is and what loads it, or how many bays of shelving and how big, or simply how many inspections, repairs or vans. Suppliers, installers and inspectors in your area quote you directly.

Pick ticket: quote requestRacking Inspections
Ticket
72111
Bin
E-03-4
Date
2026-11-20
Cost
Free

1The job

2How many (optional, it helps the quote)

Your requestnot to scale

-
-
-
-
-
-
Estimate
-

Plain arithmetic for the request, not a racking design.

3Where you are now

4Your list (optional)

  1. 01
  2. 02
Up to 12 lines: bays, frames, beams, shelves, accessories or services.
Needs and options

5Your details

Free and no obligation. By sending you agree that we may share your request with suitable racking and shelving suppliers, installers and inspectors. See our privacy policy.

Get free racking quotes